Square Mile takes pride in planning, executing and maintaining safe, efficient operations.
Removes water vapor from gas streams to prevent the formation of hydrates and corrosion in pipelines.
A JT (Joule-Thomson) plant is a system that uses a drop in gas pressure, to create a cooling effect. This process removes heavy hydrocarbons out of the gas in order to meet pipeline specs.
2500 HP compressor used in a gas injection project.
Upstream facilities are required to manage pressure safely and prepare oil and gas production for transportation.
This tank battery is equipped with vapor recovery towers (VRT) used to recover flash gas at near atmospheric pressure. The VRT provides a controlled closed loop system for safer operations, reduced emissions, and greater recovery.
Each wellhead is equipped with a fail-safe actuated valve. In normal operation it is held open with pneumatic pressure. The safety system will automatically relieve the pressure, closing the valve and containing the well, if it senses an upset.
Storage for produced oil and water.
Skid mounted separators are compact, reduce hookup time and cost.
A line heater equipped with a choke is used to reduce the well-stream pressure to a manageable pressure while counteracting the JT effect using a heated water bath.
An orifice meter classified as a Lease Master Meter is located at the end of the gas process flow. It is intended to measure all gas leaving a lease or facility and is used for allocation and can be used as a check meter.
Production upsets and low pressure flash gas that cannot be economically compressed and sold is sent to a flare for combustion.
Platform with a pig launcher and receiver.
State Waters LA
This boring machine is setup on a barge for boring a pipeline in inland waters. This method is used when surface conditions restrict access.
Welding line assembled on barges for water installation.
This installation method uses floats to float the pipe from the welding line into position. This reduces the need to move the welding line.
Once the pipe is fabricated and floated into position, it is lowered down and the floats are removed. The pipe is then buried per the project specifications.
Interlocking mats used to construct roads and pads are often used in the gulf coast where soil conditions are not stable enough to support the rig traffic.
This application utilized soil cement to stabilize the pad.
Inland water production barge in transit.
Matagorda County, Texas
This setup includes a Closed Loop system. This application allows the operator to drill the well without the need for reserve pits.
Austin County, Texas
Austin County, Texas
SME-DroneVideo-Color from Christopher McIntosh on Vimeo.